Projects in Focus

Tullow Oil — Jubilee Field Development (Ghana).

Multi-well, deep water exploratory drilling programme offshore Ghana. Jubilee Phase 1 is now in production with the Kwame Nkrumah FPSO installed in 2010. First oil was achieved from Phase 1 of the Jubilee Development in December 2010. TEAM provided both operational and office based Drilling and Completion Engineering support, day and night Drilling Supervisors and Senior Drilling Supervisors, Drilling HSE specialists and Mooring and Subsea Engineering consultants.

Egyptian Drilling Company, Various Drilling Campaigns (Mediterranean Sea)

Egyptian Drilling Company launched three new Jack-Up Rigs in 2010. The rigs went into operation in the Arabian Gulf and offshore Egypt. TEAM provided full crewing to these rigs including Rig Managers, Toolpushers, Tourpushers, Barge Engineers, Maintenance Supervisors, Rig Electricians, Roustabouts, Floorhands, Radio Operators, Crane Operators, HLO‘s and Medics.

Shell EPE — Subsea Inspection and Maintenance projects (UK and Europe).

Provision of Client Representative (Diving and ROV), QA/QC and Subsea Operations Engineering consultants in support of ongoing projects focused on construction, maintenance and repair of subsea facilities. Multiple individuals provided on multiple projects over a contract spanning several years.

PetroSA — South Coast Gas, Jabulani and F-O Projects (South Africa)

We have been contracted by PetroSA for in excess of 12 years. During this time we have provided a wide range of specialist discipline engineers for PetroSA‘s South Coast Gas, Jabulani and F-O projects. These specialist resources have encompassed Subsea, Well Services, QA/QC Inspection, Platform Topsides, Commissioning, Contract/Procurement, offshore Survey and Pipelay/flexible installation management. Project involvement has included conceptual/detail design supervision, vendor/fabrication inspection, subsea hardware interface, through to offshore installation and hook-up workscopes.

Maersk Oil Qatar — Al-Shaheen Development (Qatar)

The Al-Shaheen field is the largest offshore field in Qatar and has been in development since 1992. It now produces 300,000 barrels of oil a day, one third of all Qatar‘s oil production. The developmentincludes 160 oil production and water injection wellsand 15 platforms, including the largest in the Arabian Gulf at 13,500 tonnes. We have been supplying Production and Maintenance consultants tothese platformsfor over 12 years. We currentlysupply nearly 300personnel including Production Operators, Technicians, Mechanics, HLO‘s, CCR Operators andForemenand provide all personnel services and logistical support through our Doha office.

Occidental Petroleum — Al Rayyan Field (Qatar)

In 2007 Occidental acquired Anadarko's assets inBlock 12 and 13offshore Qatarwhich includestheAl Rayyan field. We at TEAM have provided Production and Maintenance consultants to the development since 2005. Theconsultants provided include Technicians, CCR Operators, HLO’s, Foremen, Production Operators, Crane Operators, Mechanics and Roustabouts and we manage all logistical and administrative arrangements through our Doha office.